NVIDIA files debt-shelf prospectus (Form 424B5)
Shelf registration to raise debt amid record AI-infrastructure capital spending.
SEC EDGARData center projects, grid demand, power, policy, and capital flows across the U.S. AI infrastructure boom — aggregated from public records, with every figure traceable to its source.
Recent data-center headlines · curated, as of Jun 16, 2026.
Shelf registration to raise debt amid record AI-infrastructure capital spending.
SEC EDGARState bills move on data-center electricity rate structures, water use, and reporting requirements.
LegiScanGE Vernova's data-center order backlog hits $163B; Vistra signs 20-yr nuclear PPAs (Amazon 1,200 MW, Meta 2,609 MW); Bloom fuel cells power on-site DC load.
The Motley FoolCompute-financing market reaches $20–34B with BlackRock, Blackstone, Carlyle and JPMorgan among lenders.
Investing.comFive AI-infrastructure names added to the index effective Jun 22.
GlobeNewswiredatacenters.builtfor.ai is a source-aware intelligence platform tracking the buildout of artificial-intelligence data-center infrastructure across the United States. We currently map 1,544 data-center facilities across 47 states and follow the power, policy, and capital shaping where and how AI infrastructure gets built — aggregated from public records and refreshed on a schedule, not hardcoded.
Electricity is the binding constraint on AI data centers. U.S. grid demand is currently around 540.6 GW, which we track across 7 ISO/RTO markets covering roughly 67% of national load, using U.S. Energy Information Administration (EIA) and CAISO data. Today’s leading generation sources are Natural Gas (41.4%), Nuclear (17.8%), Coal (16.1%). Explore the live power & grid dashboards.
The geographic footprint is concentrated: the leading states by mapped facilities are Virginia (343), Oregon (134), Texas (133), California (111), Ohio (90). See the full interactive U.S. data-center map and project list.
Data-center siting, power access, water use, and tax incentives are increasingly contested. We track 4,257 relevant state and federal bills via LegiScan in our policy tracker, refreshed hourly.
The buildout is capital-intensive. We follow 6 public AI-infrastructure equities along with deals, financings, and SEC filings in markets — recently, CoreWeave: $3.5B senior notes offering.
datacenters.builtfor.ai maps 1,544 U.S. data-center facilities across 47 states, sourced from OpenStreetMap. Virginia currently has the most mapped facilities.
U.S. electricity demand is currently about 540.6 GW, tracked across 7 ISO/RTO markets that cover roughly 67% of national load, using U.S. EIA and CAISO data. The leading generation sources are Natural Gas (41.4%), Nuclear (17.8%), Coal (16.1%).
By mapped facilities, the leading states are Virginia (343), Oregon (134), Texas (133), California (111), Ohio (90).
We track 4,257 state and federal bills relevant to data-center siting, power, water, taxation, and transparency via LegiScan, refreshed hourly.
We follow 6 public AI-infrastructure equities alongside the latest deals and SEC filings — for example, CoreWeave: $3.5B senior notes offering.
Learn how we source and score every figure on our methodology page. This overview is generated from current data and updates as the underlying figures refresh.