Facility profile
Microsoft Fairwater Atlanta
Frontier AI data center · Microsoft. Profile sourced from Epoch AI (CC BY 4.0).
636
Power capacity (MW)
$24.1B
Reported capital cost
United States
Country
Facility details
Epoch AI (CC BY 4.0)| Operator / owner | Microsoft |
| Power capacity | 636 MW |
| Reported capital cost | ~$24.1B |
| Country | United States |
| Primary use | OpenAI , Microsoft |
Data: Epoch AI — Data Centers (CC BY 4.0). See more sites on the facility map.
About the Microsoft Fairwater Atlanta data center
Microsoft Fairwater Atlanta is a frontier AI data center operated by Microsoft, located in United States, with a reported power capacity of 636 MW and an estimated capital cost of ~$24.1B. Profile data is from Epoch AI’s frontier data-center dataset (CC BY 4.0).
Explore the national power picture on power & grid demand, related public companies on markets, and all tracked sites on the facility map. Methodology is on our methodology page.
