72
Power capacity (MW)
$2.7B
Reported capital cost
Indonesia
Country

Facility details

Epoch AI (CC BY 4.0)
Operator / ownerOracle
Power capacity72 MW
Reported capital cost~$2.7B
CountryIndonesia
Primary use

Data: Epoch AI — Data Centers (CC BY 4.0). See more sites on the facility map.

About the Oracle Batam data center

Oracle Batam is a frontier AI data center operated by Oracle, located in Indonesia, with a reported power capacity of 72 MW and an estimated capital cost of ~$2.7B. Profile data is from Epoch AI’s frontier data-center dataset (CC BY 4.0).

Explore the national power picture on power & grid demand, related public companies on markets, and all tracked sites on the facility map. Methodology is on our methodology page.