Interconnection Queue Pressure by ISO
The interconnection queue is the real constraint on the buildout. A ranking of ISO/RTO queue pressure and where large-load requests are most likely to stall.
What this report covers
- Queue depth and study backlog by ISO/RTO
- Large-load request treatment and reform proposals
- Where capacity clears fastest
- Implications for siting decisions
The data behind it
The analyst research builds on our live power & grid data, shown here in full. The interpretation, outlook, and models are the part you can’t auto-generate — that’s the premium report.
Electricity demand by ISO/RTO (EIA) · live site data as of Jun 17, 2026
| ISO / RTO | Demand (GW) |
|---|---|
| PJM | 112.3 |
| MISO | 90.5 |
| ERCOT | 77.9 |
| SPP | 48.6 |
| CAISO | 31.8 |
| NYISO | 19.8 |
| ISO-NE | 16 |
| Generation source | Share |
|---|---|
| Natural Gas | 39.1% |
| Nuclear | 18.8% |
| Coal | 15.3% |
| Solar | 9.8% |
| Wind | 9.1% |
| Hydro | 6.1% |
Interconnection Queue Pressure by ISO — launching Q3
The interconnection queue is the real constraint on the buildout. A ranking of ISO/RTO queue pressure and where large-load requests are most likely to stall.
- Queue depth and study backlog by ISO/RTO
- Large-load request treatment and reform proposals
- Where capacity clears fastest
- Implications for siting decisions
Included with a paid plan — built for analyst, investor & institutional users.
About “Interconnection Queue Pressure by ISO”
The interconnection queue is the real constraint on the buildout. A ranking of ISO/RTO queue pressure and where large-load requests are most likely to stall. It is part of our premium analyst research — interpretation, forward outlooks, and models that go beyond the free data reports, included with a paid plan. Launching Q3. Explore the underlying data on the power, policy, markets, and map pages.