The Two Queues: Interconnection Pressure by ISO
The grid has two interconnection bottlenecks, not one — a supply queue of power plants and a fast-growing demand queue of data centers. A scorecard of where each is most likely to stall, and where capacity clears fastest.
What this report covers
- Queue depth and study backlog by ISO/RTO
- Large-load request treatment and reform proposals
- Where capacity clears fastest
- Implications for siting decisions
The data behind it
The analyst research builds on our live power & grid data, shown here in full. The interpretation, outlook, and models are the part you can’t auto-generate — that’s the premium report.
Electricity demand by ISO/RTO (EIA) · live site data as of Nov 8, 2026
| ISO / RTO | Demand (GW) |
|---|---|
| PJM | 83.3 |
| MISO | 67.2 |
| ERCOT | 44.4 |
| SPP | 29.1 |
| CAISO | 19.1 |
| NYISO | 13.5 |
| ISO-NE | 10.7 |
| Generation source | Share |
|---|---|
| Natural Gas | 43.8% |
| Nuclear | 19% |
| Coal | 16.7% |
| Wind | 7.2% |
| Solar | 6% |
| Hydro | 5% |
The Two Queues: Interconnection Pressure by ISO
The grid has two interconnection bottlenecks, not one — a supply queue of power plants and a fast-growing demand queue of data centers. A scorecard of where each is most likely to stall, and where capacity clears fastest.
- Queue depth and study backlog by ISO/RTO
- Large-load request treatment and reform proposals
- Where capacity clears fastest
- Implications for siting decisions
Included with a paid plan — built for analyst, investor & institutional users.
About “The Two Queues: Interconnection Pressure by ISO”
The grid has two interconnection bottlenecks, not one — a supply queue of power plants and a fast-growing demand queue of data centers. A scorecard of where each is most likely to stall, and where capacity clears fastest. It is part of our premium analyst research — interpretation, forward outlooks, and models that go beyond the free data reports, included with a paid plan. Explore the underlying data on the power, policy, markets, and map pages.