1,547
Mapped facilities · 46 states
436.5 GW
Tracked demand · 69% of U.S. load
589
Data-center bills · 45 states
93
Frontier data centers tracked

Executive summary

The U.S. AI data-center buildout continues to be defined by one binding constraint: power. As of Sep 29, 2026, we track 1,547 data-center facilities mapped from OpenStreetMap across 46 states, 436.5 GW of total U.S. grid demand across 7 ISO/RTO markets (~69% of U.S. load; data centers are a growing share, not the whole), and 589 data-center–related legislative items across 45 states plus 52 federal. On the frontier, Epoch AI tracks 93 leading-edge data centers totaling roughly 13.5 GW of power.

Geographic concentration remains extreme: Virginia leads with 342 mapped facilities, and the top five states account for the bulk of activity. The leading generation source on the grid right now is Natural Gas at 44%. Policy is the emerging variable — moratoriums, zoning, and ratepayer-impact bills are rising across states as communities weigh the load growth.

Facilities & geography

Top states by mapped data-center facilities (OpenStreetMap, ODbL):

StateFacilitiesShare
Virginia34222.1%
Texas1409.0%
Oregon1338.6%
California1117.2%
Ohio905.8%
Washington654.2%
Arizona613.9%
Iowa593.8%
Illinois513.3%
New Jersey483.1%

Power & grid demand

Live electricity demand by ISO/RTO (EIA), totaling 436.5 GW across 7 markets. The California ISO daily peak is roughly 34 GW.

ISO / RTODemand (GW)
PJM87.7
MISO71.9
ERCOT57.9
SPP31.8
CAISO22.9
NYISO15.7
ISO-NE12.8

U.S. generation mix (share of output):

SourceShare
Natural Gas44%
Nuclear18.4%
Coal16.6%
Solar7.5%
Wind6.6%
Hydro4.7%
Other2.3%

Policy landscape

589 tracked data-center bills across 45 states and 52 federal items (LegiScan, CC BY). States with the most activity:

StateTracked bills
Michigan49
Pennsylvania46
New Jersey44
Virginia43
Minnesota31
New York23
Illinois22
Tennessee19

Capital & companies

Recent tracked deals, financings, and PPAs:

CompanyEventDate
Nvidia / KKRSamsung to inject $1 billion into Nvidia- and KKR-backed AI infrastructure firm2026-09-29
AmazonAmazon to acquire two data centers in Hong Kong2026-09-29
—Samsung Invests $1 Billion in US AI Infrastructure Firm Helix2026-09-29
LambdaLambda plans data center in Oklahoma2026-09-29
BroadcomHybrid Photonic Integrated Circuit Market Size, Share, Growth, and Forecast, …2026-09-29
—Samsung Group to invest US$1 billion in AI infrastructure company Helix2026-09-29
AlphabetCrusoe Developing Data Center Campus in Armstrong County, Texas2026-09-28
Meta / VantageCan Meta’s C$13 Billion Alberta Bet Strengthen its AI Infrastructure Advantage?2026-09-28

Recent SEC filings referencing data centers (EDGAR):

CompanyFormDate
Hut 8 Corp. HUT8-K2026-09-28
Hyperscale Data, Inc. 8-K2026-09-18
CoreWeave, Inc. CRWV8-K2026-09-17
AIB Data Centers Inc. AIB8-K2026-09-11
AIB Data Centers Inc. AIB8-K2026-09-10
Vertiv Holdings Co VRT8-K2026-09-02

Frontier compute

The largest known frontier data centers by reported power capacity (Epoch AI, CC BY 4.0); Epoch also tracks 3,624 notable AI models:

FacilityOperatorMWCountry
Colossus 2xAI946United States
Anthropic-Amazon New CarlisleAmazon910United States
Microsoft Fairwater AtlantaMicrosoft636United States
Meta PrometheusMeta496United States
OpenAI Stargate AbileneOracle421United States
Microsoft Fairwater WisconsinMicrosoft369United States
Google Pryor (North)Google368United States
Colossus 1xAI340United States
Google New AlbanyGoogle333United States
DayOne Kempas—322Malaysia

Methodology & sources

This report is generated from the same data behind the live dashboards, aggregated from available public sources and proprietary data feeds: facility locations from OpenStreetMap (ODbL); electricity demand and generation mix from the U.S. EIA; legislation from LegiScan (CC BY); deals, equities, and SEC filings via market-data and EDGAR feeds; and frontier-compute figures from Epoch AI (CC BY 4.0). Figures reflect the data as of Sep 29, 2026 and update as the underlying sources refresh. See the full methodology. This report is informational only and not investment advice — see our disclaimer.

About this report

“State of the U.S. AI Data-Center Buildout” is a free, regularly-updated report synthesizing our facility, power, policy, capital, and frontier-compute data into one sourced snapshot, as of Sep 29, 2026. Explore the underlying data on the map, power, policy, and markets pages.